Change Tracker: Docusign IAM and Connected Systems

Article image
25 Nov 2026
8 min
Docusign IAM
Implementation
MCP

This page lists dated changes to Docusign IAM and to the systems Fluidlabs connects to it, newest first, with what each change breaks or alters for integrations. Each row gives the vendor's date and source, the Fluidlabs app built on that system, and our article on what to test.

Last checked: 2026-11-25, the day the list last changed.

Changes, newest first

DateChangeFluidlabs appSourceArticle
2026-11-19Xero: Month-End Close Review, client portfolio review and quarterly review preparation run inside ChatGPT for Accounting on live Xero data. One sign-in connects a whole client portfolio.Xero for Docusign IAMXero blogWhat month-end close automation needs
2026-10-31Xero: user permissions are being rebuilt so access matches the job, for example raising a purchase order without seeing supplier bills.Xero for Docusign IAMXero blogWhat changes for connected apps
2026-10-28Wealthbox: the Wealthbox Vault add-on adds unlimited file storage, retained file versions and a Compliance Monitor role with a complete audit log of file activity.Wealthbox CRM for Docusign IAMWealthbox blogWhat the Compliance Monitor means for documents
2026-10-26Microsoft Dataverse: the Dataverse MCP Server supports custom APIs, so agents can call business logic built as a Dataverse Custom API, not only table operations.NoneMicrosoft Power Platform blogWhat agents can do with custom APIs
2026-10-19NetSuite: Bank Reconciliation Suggestion, Banking Statement, Banking Transaction and Transaction Match records open to external AI clients through the NetSuite AI Connector Service (MCP), and clients can accept or reject reconciliation suggestions.NetSuite for Docusign IAMNetSuite release notes, October 19, 2026Banking data opens to MCP agents
2026-10-15Docusign Connect: the Publish page is deprecated as of 18 November 2026, and its republish functions are in the Connect dashboard. The Logs page follows later in 2027.NoneeSignature 26.3.02.00 release notesWhat breaks when the Publish page goes
2026-10-15Docusign eSignature: a Joint Agreement envelope sent to the network's designated CC recipient needs a matching linkedAccountConfigurationId, name and email. Envelopes that fail the check are blocked from sending. The release notes expected the rollout by the end of October 2026.NoneeSignature 26.3.02.00 release notesWhat breaks in Connect integrations
2026-10-13Docusign IAM: runs natively inside Salesforce, Agentforce and Slack, as part of an expanded Salesforce partnership.NoneDocusign press releaseWhat changes for custom Salesforce setups
2026-10-13Xero: the Xero Remote MCP server is generally available. Xero hosts it, and an agent connects with its URL and a sign-in instead of a local server.Xero for Docusign IAMXero developer blogWhat it opens for AI agents
2026-10-08Microsoft Graph: from 1 April 2027, SharePoint Online and OneDrive begin removing pre-authenticated (tempauth) URLs. URLs from the affected Graph file APIs then need a Microsoft Entra ID token.Microsoft Excel for Docusign IAMMicrosoft 365 Developer BlogMicrosoft and HubSpot auth changes
2026-10-06HubSpot: from 14 October 2026, HubSpot-hosted domains still set to TLS 1.0 or 1.1 require TLS 1.2 at minimum.NoneHubSpot developer changelogMicrosoft and HubSpot auth changes
2026-10-05MCP TypeScript SDK 2.3.1: requireBearerAuth in the legacy server package takes the optional expectedResource, so a legacy server can reject tokens issued for another server.NoneGitHub releaseLegacy server patch closes the token gap
2026-10-02MCP TypeScript SDK 2.3.0: Server.connect() rejects while an instance is already connected, so each request needs its own server. HTTP transports follow same-origin redirects only, and the optional expectedResource adds an audience check on tokens.NoneGitHub releaseAudience-bound tokens and transport changes
2026-09-30Procore: from 27 October 2026, outbound traffic from Procore sandboxes leaves from new egress IP addresses. Integrations that allow-list the old sandbox IPs may fail until they allow the new ones.Procore for Docusign IAMProcore status pageWhat ERP connectors check
2026-09-23Zoho CRM: when a Client Portal user calls the Users API, the response holds only the user's name fields, ID and type. The change is live.Zoho CRM for Docusign IAMZoho CRM developer communityWhat the restriction breaks
2026-09-23MCP TypeScript SDK 2.1.0: clients can opt in to DPoP sender-constrained access tokens (RFC 9449), and servers can answer a tool, resource or prompt call with an OAuth scope challenge.NoneGitHub releases: client, serverOAuth DPoP tokens and scope challenges
2026-09-21NetSuite: from release 2027.1, new integrations can no longer use token-based authentication (TBA). Existing TBA integrations keep working until end of support, tentatively release 2028.2.NetSuite for Docusign IAMNetSuite 2026.2 release notesWhat breaks by release 2027.1
2026-09-14Docusign eSignature: PDF/A processing improves font embedding and color profile handling, so completed agreements pass archival validation. Senders and signers change nothing.NoneeSignature 26.3.01.00 release notesWhat archival integrations need
2026-08-25Docusign IAM: available inside Google Cloud Gemini Enterprise for Legal through the Docusign MCP connector.NoneDocusign press releaseWhat changes for agents on Docusign IAM
2026-08-17Docusign eSignature: Shared Access covers Bulk Send and batch actions, such as correcting or voiding envelopes for another user.NoneeSignature 26.3.00.00 release notesWhat's changing for Bulk Send
2026-07-29Zoho CRM: Last_Name in Leads and Contacts stops being system-mandatory, and each layout makes First_Name or Last_Name mandatory. Breaking changes reach the Fields and Layouts Metadata APIs and Get Records in API versions 2 to 8. Zoho expected the rollout by the end of October 2026.Zoho CRM for Docusign IAMZoho CRM developer communityWhat breaks syncs

How this list works

  • Date is the date on the vendor's notice: a release note, a changelog entry, a blog post, a press release or a status page. A deadline inside the change, such as a cutover day, is in the change text.
  • Fluidlabs app names the Fluidlabs app built on the system that changed, or None.
  • Each row has a fixed link on its date, so you can share one change. The articles link back to their rows.
  • We add a row when we publish an article about a change. Rows stay after a change has rolled out, so the list keeps the history.
Other articles
Get in touch

Tell us what Docusign needs to talk to

Tell us what you need. Within 48 hours you get a scoped plan and a fixed price in writing, or a straight “you don't need us.” No charge, nothing to sign.

Send request →

or email us at hello@fluidlabs.com